Document Type
Technical Report
Handle Identifier
https://hdl.handle.net/10365/32788
Publication Date
7-16-2012
Publisher
United States. Army Corps of Engineers. St. Paul District (U.S.)
Abstract
The purpose of this study is to evaluate options for increasing the flow and resultant residual Red River of the North flood stage through the flood damage reduction area as an alternative environmental mitigation project to the proposed fish passages on the Red and Wild Rice River control structures. This study evaluates River Stages (RS) beyond the approximately RS 31 feet planned for in the Integrated Final Feasibility Report and the Final Environmental Impact Statement (FR/FEIS) dated July 2011. This plan is now known as the Federally Recommended Plan (FRP).
Recommended Citation
Houston-Moore Group, "Through Flood Damage Reduction Area" (2012). Metro Flood Diversion Authority. 17.
https://digitalcommons.ndsu.edu/metro-flood-diversion/17
Appendix B - Hydraulic Evaluation Results - COMPLETE.pdf (1000 kB)
Appendix C - Operation and Maintenance Background Data - COMPLETE.pdf (692 kB)
Appendix D - HTRW Review - COMPLETE.pdf (178956 kB)
Appendix E - Conceptual Mitigation Plans - COMPLETE.pdf (105612 kB)
Appendix F - Conceptual Mitigation Opinion of Probable Costs - COMPLETE.pdf (1482 kB)
Appendix G - Project Schedule - COMPLETE.pdf (332 kB)