Document Type
Technical Report
Handle Identifier
https://hdl.handle.net/10365/32785
Publication Date
9-1-2013
Publisher
United States. Army Corps of Engineers. St. Paul District (U.S.)
Abstract
The Red River basin in eastern North Dakota and along the western Minnesota border has a long history of flooding due to the unique hydrology of the area. Three large rivers, the Red River of the North, the Wild Rice River (ND), and the Sheyenne River, converge in the Fargo-Moorhead metropolitan area and contribute to extensive flooding. The Federally Recommended Plan (FRP) for the flood risk management project consists of a 36-mile diversion channel (six miles of which is a connecting channel) around the west side of the city of Fargo, a staging area, and approximately 12 miles of tie-back levees. The FRP is described as the Locally Preferred Plan (LPP) in the Final Feasibility Report and Environmental Impact Statement (FEIS) dated July 2011; a Record of Decision was signed on April 3, 2012.
Recommended Citation
United States. Army Corps of Engineers. St. Paul District, "Supplemental Environmental Assessment" (2013). Metro Flood Diversion Authority. 7.
https://digitalcommons.ndsu.edu/metro-flood-diversion/7
Public notice_Final.pdf (27 kB)
Appendix A - Project Alignment.pdf (1511 kB)
Appendix B - In-Town Levees.pdf (525 kB)
Appendix C - Oxbow Hickson Bakke Ring Levee.pdf (400 kB)
Appendix D - Hydraulics and Hydrology.pdf (3363 kB)
Appendix E - Public Comments.pdf (3541 kB)
Appendix F -Comments and Responses.pdf (517 kB)
Attachment 1 - 404(b)(1).pdf (1760 kB)
Attachment 2 - Programmatic Agreement(1).pdf (1656 kB)
Attachment 3 - FONSI.pdf (109 kB)