Files
Download Full Text (5.1 MB)
Download Final Presentation Emerson Smith.pdf (117.8 MB)
Download Emerson Smith Thesis Boards TOP FINAL.pdf (18.6 MB)
Download Emerson Smith Thesis Boards MID FINAL.pdf (13.3 MB)
Download Emerson Smith Thesis Boards BOTTOM FINAL.pdf (3.8 MB)
Download Emerson Smith THESIS BOOK FINAL.pdf (126.8 MB)
Download Atrium From Main Entry View.png (16.1 MB)
Download Laboratory View.png (29.0 MB)
Download North Facade Money Shot 2.png (11.2 MB)
Download North Gallery With People.png (13.6 MB)
Download View of the Sleeping Giant From Building.png (24.9 MB)
Date of Award
2017
Document Type
Thesis
Handle
https://hdl.handle.net/10365/26041
College
Arts, Humanities, and Social Sciences
Department
Architecture & Landscape Architecture
Faculty Advisor
Crutchfield, David
Publisher
North Dakota State University
Rights
NDSU Policy 190.6.2
Abstract
As human development increasingly puts pressure on the natural environment, research into how to mitigate damage will be more vital than ever. Despite this, society chooses to ignore the advice of experts and disregard the remedies that they propose. By bringing the public and scientists together both groups will be positively benefited. To address this problem, this thesis proposes an ecological conservation center on the waterfront of Thunder Bay, ON.
Recommended Citation
Smith, Emerson, "Connected by Nature: Linking the Public to Science" (2017). Architecture Theses. 913.
https://digitalcommons.ndsu.edu/architecture-theses/913
Emerson Smith Thesis Boards TOP FINAL.pdf (19010 kB)
Emerson Smith Thesis Boards MID FINAL.pdf (13655 kB)
Emerson Smith Thesis Boards BOTTOM FINAL.pdf (3863 kB)
Emerson Smith THESIS BOOK FINAL.pdf (129880 kB)
Atrium From Main Entry View.png (16531 kB)
Laboratory View.png (29686 kB)
North Facade Money Shot 2.png (11446 kB)
North Gallery With People.png (13911 kB)
View of the Sleeping Giant From Building.png (25539 kB)